03
2023
-
01
Which company is better for cleaning cooling tower fillings (cooling tower manufacturers good at cleaning cooling tower fillings)
Author:
Cooling tower fill Which cleaning company is better? Guangdong Teling Air Conditioning is engaged in cooling tower cleaning, cooling tower chemical cleaning, cooling tower cleaning agents, cooling tower cleaning powder, cooling tower cleaning liquid, cooling tower descaling, cooling tower descaling agents, cooling tower descaling powder, cooling tower descaling liquid, cooling tower chemical cleaning, and cooling tower chemical cleaning agents. Next, let's introduce some knowledge about cooling tower fill cleaning.
Cleaning cooling tower fill is a process of cleaning and removing stains from the surface of the equipment using chemical or physical methods. This chemical cleaning uses the form of drug circulation cleaning. The drug is added to the cooling tower water, and the main cleaning agent GJ-1B high-efficiency antibacterial and sludge stripping agent and a thickening agent are selected. This makes the biological sludge lose its activity, peels off, disperses into small molecular particles, and is discharged with the water. This type of cleaning agent is neutral to slightly alkaline and does not corrode the equipment. This cleaning uses an online cleaning method without stopping the machine, which does not affect normal use.
The cleaning process is: control water level → sterilization and sludge stripping cleaning → water replacement → completion.
Specific steps for cleaning cooling tower fill:
1. Control the water level. Control the water level of the cooling tower. If conditions permit, appropriately lower the water level to increase the concentration of the chemical agent and enhance the cleaning effect.
2. Add GJ-1B sterilization and sludge stripping agent to the cooling tower. Its function is to kill bacteria, algae, and biological sludge in the circulating water, reducing their adhesion to the equipment. At the same time, add a penetrant and dispersant to allow the cleaning agent to penetrate into the dirt and disperse the stripped sludge into small molecular particles, suspending them in the water to avoid secondary sedimentation.
3. Circulate and clean for 12-24 hours to dissolve the biofilms and sludge stripped from the equipment and pipelines into the water and remove them from the system. Generally, the water flow can clean everywhere.
4. After draining, replace the entire system with clean water until the water is clear.
12
2023-04
Precautions for using closed-circuit cooling towers
03
2023-01
03
2023-01
03
2023-01
What are the roles of cooling tower components in cooling tower renovation?
03
2023-01
03
2023-01
Service Hotline:
+86-138 2574 5855
+86-189 0261 0628
E-mail:dykj1688@yeah.net
Address: Guangdong Province, Huizhou City, Boluo County, Longxi Town, Longyuan Avenue, Dongyan Technology Industrial Park
Follow us

Scan with your phone
Copyright © Guangdong Dongyan Cooling Equipment Co., Ltd. All rights reserved.
Power by:www.300.cn | SEO | Privacy Policy